• 0

Project Consultancy, Reports & Profiles

1.   What are The Natural Resources in the Congo

The Republic of Congo has enormous potential for hydroelectric power. In 2006, it agreed to a $9 billion project with U.S.-based Tri-Star Power, which would have created a dam on the Sangha River, requiring that 40 square miles (103 km2) of rainforest be cleared and hundreds of people resettled. The project is on hold because residents are opposed to it. There is also potential for mining—the country contains an estimated US$24 trillion worth of minerals, including copper, cobalt, diamonds, gold and uranium. These resources remain largely untapped. Congolese exports consist mainly of raw materials such as wood, coffee and cocoa beans.


2. What are the Business Opportunities in Congo?

Though it may not be the first country to consider where to start a business, the Congo offers some unique opportunities for small businesses. The costs are low, and taxes are low, but plenty of potential consumers and business opportunities are still to explore. If you’re looking at investing in another country, consider the Congo; here’s why this might be the right move for your business. Several factors have made Congo an attractive place for foreign investors, including its favourable geographical location. The Democratic Republic of Congo lies at a crossroads of land, sea and air transport. This has made it an important transport corridor between Europe and Asia on one side and Africa on another. It is also rich in natural resources, including gold, diamonds and coltan (used to make cell phones). In addition to abundant natural resources, there are also many human resources available: 45 million people live here. Congolese citizens are educated and multilingual; they speak French as well as at least two local languages—Swahili or Lingala—and often English as well.


3. What Businesses are Successful in Congo?

One of Africa’s largest economies and one of its fastest-growing, The Democratic Republic of Congo (DRC) has a population estimated at 68 million people. With more than 80 per cent living on less than $1 per day, but with vast mineral resources and an educated workforce, now is a good time to invest in DRC. There have been extensive efforts to improve infrastructure in recent years, including roads and railways. Investing here could be extremely profitable for companies willing to take a risk. The country also boasts impressive human capital. Over 90% of Congolese are literate, and 50% have completed secondary education. This makes it easier to find skilled workers, often very inexpensive due to low wages and high unemployment rates in urban areas. The government is also open to foreign investment. It offers incentives like tax holidays or other benefits through special economic zones such as Kinshasa Industrial Park, where investors can get tax breaks for up to 20 years if they build factories within these zones.

 

4. Business-Friendly Policies and Government Initiatives;

The government of Congo has been working to make doing business easier for its citizens and investors, enacting a host of policies that enhance outlining procedures regarding public-private partnerships (PPP) agreements. This is an important step forward in attracting investors who are interested in PPPs as a means of funding infrastructure projects.


5. Congo Industrial Infrastructure

The government is making efforts to improve infrastructure and build a better economy by focusing on industrial development. The government has also set up free trade zones in Boma, Matadi, and Lubumbashi. Over 1 million tourists visit Congo each year and spend more than $500 million on travel alone. The country is also rich with natural resources, including cobalt, diamonds, copper ore, gold, iron ore, tin ore, as well as uranium reserves and other precious metals. These resources have been exploited for many years but were not developed properly due to corruption within governments of previous regimes. This led to no proper funding of infrastructure or maintenance of existing infrastructures, which are now starting to fail. Many investors are taking advantage of these opportunities and investing heavily in building new roads, railways, ports etc., leading to further economic growth.

 

6. What are the steps for Starting a Business in Congo?

In order to start a business in Congo, it’s important to learn about local regulations first. Here are some things you need to know:

1. A Congolese company can be created under three forms of legal entity: General Partnership (Société en Nom Collectif), Limited Liability Company (Société à Responsabilité Limitée) and Joint-Stock Company (Société Anonyme).

2. Foreigners cannot own land in Congo; however, they can lease land for 50 years.

3. The minimum capital requirement for all companies is 100 million CFA francs (USD 175,000).

4. All companies must have at least one shareholder and one director/manager; shareholders may not act as directors or managers unless they are directors or managers at another company.

5. Shareholders do not enjoy limited liability protection, so any debts incurred by the company will become their responsibility.

6. Director/managers must reside in Congo and hold a Congolese passport. 7. The government charges an annual tax on profits between 0% and 10%. 8. If you want to hire employees, you will have to register with SONAPI (the national social security fund); however, there are no restrictions on foreign ownership when it comes to hiring workers.

9. There are no restrictions on foreign ownership when setting up a business.

10. To register your new company, you will need two copies of your articles of incorporation and five copies of your registration form from SONAPI. It would help if you took care to select a name that does not infringe upon that of another registered company; otherwise, your application could be rejected.

 

7. Market Size of Congo

The total size of a market is important for any business. However, knowing how large or small it is and where you might fit into it can be vital to identifying business opportunities. The market in Congo may seem like a small one, with a population of 79 million people and a gross domestic product (GDP) per capita of $2,600 in 2015. However, Congo’s GDP has been growing at an average rate of 7% per year over the past decade.

 

8. Spending power in Congo

With a population of over 80 million, and a GDP of over $30 billion, there is plenty of room for new businesses to succeed. The country is also rich in natural resources such as diamonds, gold, and oil. This means that there are large corporations looking to invest or exploit these resources. You may even be able to partner with one of these companies to achieve your goals. The only issue is that corruption can be rampant, and deals could get complicated quickly.


9. Industrial growth of Congo

The DRC has several mines with mineral resources, including cobalt, copper, diamonds, gold, silver, and zinc. The nation also has considerable petroleum reserves; however, oil deposits are largely untapped. Other sectors such as forestry, farming and fishing are also important to Congo’s economy. According to reports published by the National Bank of Congo (BNC), gross domestic product (GDP) growth reached 7.5 per cent in 2015. The report also revealed that a 6 per cent growth rate was expected for 2016. This is due to an increase in mining activities which contributed to a 4.7 per cent increase in GDP during the first quarter of 2016. This is compared to the 2.8 per cent growth registered during the same period last year. This will be further boosted by government initiatives toward developing infrastructure, agriculture, and the services sector, including banking services.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Wooden Pencil Manufacturing Business
Wooden Pencil Manufacturing Business

Wooden Pencil Manufacturing Business. Production of Writing Instruments. Start a Prof... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Medical Disposables
Manufacturing Business of Medical Disposables

Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Plastics are made... Read More

Capacity :
Plastic Granules : 2400 Kgs/Day PET Granules : 2400 Kgs/Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
238.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size
Plant and Machinery cost:
802.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
44.00 %
TCI :
1474.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

Disposable Syringes made of plastic ... Read More

Capacity :
Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos.
Plant and Machinery cost:
174.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
515.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully

Lead from galena refers to the ex... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)

Analytical testing labs are facilities that specialize in tes... Read More

Capacity :
-
Plant and Machinery cost:
410.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Invest In Kraft Paper From Pulp  Industry
Invest In Kraft Paper From Pulp Industry

 

Kraft paper, also... Read More

Capacity :
Kraft Paper 20 MT Per Day
Plant and Machinery cost:
2002.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
4040.00Lakhs
Add To Inquiry Basket
Start Carton Boxes Manufacturing Business
Start Carton Boxes Manufacturing Business

Carton boxes, also known as corrugated boxes, are commonly used in packaging and ship... Read More

Capacity :
Carton Boxes 40 MT Per Day
Plant and Machinery cost:
409.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
2071.00Lakhs
Add To Inquiry Basket
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant

 

Essential oils and oleoresins are concentrated... Read More

Capacity :
-
Plant and Machinery cost:
934.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1479.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Solar PV Glass
Start Manufacturing Business Of Solar PV Glass

Solar PV Glass, also known as photovoltaic gl... Read More

Capacity :
Solar PV (Photovoltaic) Glass 300 MT per Day
Plant and Machinery cost:
2800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
4150.00Lakhs
Add To Inquiry Basket
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)

Are you curious about what exactly a Truck Tr... Read More

Capacity :
Cost Estimation Capacity: Flatbed Trailer 6 Nos per Day Tipper Trailer 6 Nos per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1172.00Lakhs
Add To Inquiry Basket
Liquid Caustic Soda Industry (From Caustic Flakes)
Liquid Caustic Soda Industry (From Caustic Flakes)

Liquid caustic soda, also known as sodium hydroxide, is a powerful and versatile chem... Read More

Capacity :
Liquid Caustic Soda Lye 48% 80 MT Per Day
Plant and Machinery cost:
305.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
888.00Lakhs
Add To Inquiry Basket
A Business Plan For Red Oxide Pigment
A Business Plan For Red Oxide Pigment

Red oxide pigment, also kno... Read More

Capacity :
Red Oxide Pigment 200 MT Per Day
Plant and Machinery cost:
5081.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
6945.00Lakhs
Add To Inquiry Basket
A Business Plan For Linear Alkyl Benzene
A Business Plan For Linear Alkyl Benzene

Linear Alkyl Benzene (LAB) is a versatile chemical compound that pl... Read More

Capacity :
Linear Alkyl Benzene 20 MT Per Day
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
832.00Lakhs
Add To Inquiry Basket
Invest In Methylaniline Business
Invest In Methylaniline Business

Methylaniline is a clear to... Read More

Capacity :
Methylaniline 40 MT Per Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2056.00Lakhs
Add To Inquiry Basket
Invest In Alloy Wheel Business for Two Wheelers
Invest In Alloy Wheel Business for Two Wheelers

Alloy wheels for two-wheele... Read More

Capacity :
Alloy Wheel for 2 Wheeler 400 Pcs Per Day
Plant and Machinery cost:
157.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
802.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity :
-
Plant and Machinery cost:
1064.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3229.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

Automated Vehicle Scrapping and Recycling Unit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Business of Surgical Cotton and Cotton Balls
Start Business of Surgical Cotton and Cotton Balls

 

Surgical cotton, ... Read More

Capacity :
Surgical Cotton 10,500 Kgs Per Day Cotton Balls 4,500 Kgs Per Day
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
Invest In Mink Blankets Production
Invest In Mink Blankets Production

 

Mink blankets, de... Read More

Capacity :
-
Plant and Machinery cost:
2700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Water Based Emulsion (Used as Coating for Paper Cups and Straws Replacing PE Coating)
Start Manufacturing of Water Based Emulsion (Used as Coating for Paper Cups and Straws Replacing PE Coating)

Water-based emulsion refers... Read More

Capacity :
Acrylate Emulsions 3 MT Per Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
414.00Lakhs
Add To Inquiry Basket
Setup Unit of Dal Mill (Pulses)
Setup Unit of Dal Mill (Pulses)

Dal Mill encompasses the transformation of various types of pulses - such as lentils, ... Read More

Capacity :
-
Plant and Machinery cost:
107.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
Start Milk Processing Unit (Milk, Ghee, Curd, Butter Milk, Paneer, Cheese, Ice Cream, Milk Powder & Cheese Powder)
Start Milk Processing Unit (Milk, Ghee, Curd, Butter Milk, Paneer, Cheese, Ice Cream, Milk Powder & Cheese Powder)

Capacity :
-
Plant and Machinery cost:
22000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
29400.00Lakhs
Add To Inquiry Basket
Start production of Compressed Bio Gas Using Napier Grass
Start production of Compressed Bio Gas Using Napier Grass

Compressed Bio Gas represents a pivotal advancement in the quest for renewable energy solutions, with Napier Grass eme... Read More

Capacity :
-
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2800.00Lakhs
Add To Inquiry Basket
Setup Plant of Silicon Metal
Setup Plant of Silicon Metal

Silicon Metal, a semi-metallic or metalloid, is a high-purity form of silicon, distinguished from more common silicon ... Read More

Capacity :
Silicon Metal 25,000 Kgs Per Day
Plant and Machinery cost:
430.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
1696.00Lakhs
Add To Inquiry Basket
Start Pharmaceutical Unit (Paracetamol Tablets)
Start Pharmaceutical Unit (Paracetamol Tablets)

Paracetamol, also known as acetaminophen in the United States and Canada, is a widely... Read More

Capacity :
Paracetamol Tablets (500mg) 25,000 No. of Strips Per Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Setup Cenosphere Processing Plant from Fly Ash
Setup Cenosphere Processing Plant from Fly Ash

Cenosphere processin... Read More

Capacity :
Cenosphere 5,000 MT Per Annum
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
629.00Lakhs
Add To Inquiry Basket
Start Production Of Instant Tea and Coffee
Start Production Of Instant Tea and Coffee

Instant Tea and Coffee: A Brewing Success Story Dive into the world of instant beverages with our consultancy servic... Read More

Capacity :
Black Instant Masala Tea 800 Packs Per Day Green Instant Tea 800 Packs Per Day Regular Instant Coffe
Plant and Machinery cost:
143.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
530.00Lakhs
Add To Inquiry Basket
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin

An active pharmaceutical in... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Project Report on Decortication and Packing of Peanut
Project Report on Decortication and Packing of Peanut

If you work in the food sector, especially if you deal with peanuts, you've probably h... Read More

Capacity :
Peanuts (50 Kgs each Bag): 400 Bags Per Day
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
534.00Lakhs
Add To Inquiry Basket
IV Cannula and Catheters Manufacturing Plant
IV Cannula and Catheters Manufacturing Plant

 

Although the name... Read More

Capacity :
IV Cannula with Wings & with Injection Port: 75,000 Pcs. per day Catheters: 18,750 Pcs. per day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Surgical Sutures Assembling
Manufacturing Business of Surgical Sutures Assembling

Surgical sutures are used t... Read More

Capacity :
250 Boxes per day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
313.00Lakhs
Add To Inquiry Basket
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups

To extract cocoa from raw, roaste... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs

 

Lithium ion (Li-ion) ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for PVC Edge Banding Tape Manufacturing Business
Business Plan for PVC Edge Banding Tape Manufacturing Business

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to setup Plastic Waste Recycling Plant
How to setup Plastic Waste Recycling Plant

A Plastic Waste Recycling Plant (also known as a Pla... Read More

Capacity :
-
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
401.00Lakhs
Add To Inquiry Basket
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit

Vehicle recycling is the de... Read More

Capacity :
-
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Badminton Rackets Manufacturing Business
Badminton Rackets Manufacturing Business

Badminton rackets productio... Read More

Capacity :
1000 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
353.00Lakhs
Add To Inquiry Basket
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap

Cold rolling is a work hard... Read More

Capacity :
-
Plant and Machinery cost:
2400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
8300.00Lakhs
Add To Inquiry Basket
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan

Children's clothing may not... Read More

Capacity :
T-Shirts: 84 Pcs. per day | Bottom Wear: 84 Pcs. per day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business

 

Start Traction Motors Permanent Magnet Synchronous Motors, Br... Read More

Capacity :
Permanent Magnet Synchronious Motors (5 KW, 48/72 Volt with 3000 RPM) 40 Nos. Per Day Brushless
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
510.00Lakhs
Add To Inquiry Basket
Dental Care Products GI Cement & Composite Lite Cure Business Plan
Dental Care Products GI Cement & Composite Lite Cure Business Plan

Consider starting a glass i... Read More

Capacity :
GI Cement (Part A Powder 5 gms each & Part B Liquid 5 ml each) 20000 Pcs. per Day | Compsite Lite Cu
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
340.00Lakhs
Add To Inquiry Basket
Citric Acid Production Business Plan
Citric Acid Production Business Plan

Citrus fruits have a sour t... Read More

Capacity :
100 MT Per Day
Plant and Machinery cost:
8400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
13200.00Lakhs
Add To Inquiry Basket
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Epoxy Hardener Plant
Set Up Epoxy Hardener Plant

In order to create an epoxy resin for its intended use, epoxy hardeners are nearly always required. Epoxies do not com... Read More

Capacity :
Polyamide Hardener: 6 MT per Day Cycloaliphatic Amine Hardener:1.2 MT per Day
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
ZINC INGOTS Manufacturing Business Plan
ZINC INGOTS Manufacturing Business Plan

 

Zn, zinc is a chemical element. At normal temperature, zinc is a slightly brittle metal that, when its oxida... Read More

Capacity :
6 MT per Day
Plant and Machinery cost:
4500000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
52500000.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity :
100 CBM per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3100.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica From Rice Husk Ash
A Business Plan for Silica From Rice Husk Ash

 

The high silica content in the rice husk ash has attract... Read More

Capacity :
0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 121 - 180 of 641 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR